Project scenario · Manufacturing & Industrial
How we would move a manufacturer from calendar-based maintenance to condition-based alerts on motors and pumps, starting with the sensors already on the line.
Typical starting point: multi-site discrete manufacturer. This scenario shows how we approach this class of problem. It does not describe a named client engagement, so no results are claimed.
- Typical client
- Multi-site discrete manufacturer
- Industry
- Manufacturing & Industrial
- Built with
- Iotron Sentinel · Industrial gateways · OPC UA / Modbus · MQTT
- Measured against
- 4 agreed measures
03The Iotron solution
What we build.
Edge AI on Iotron Sentinel: anomaly models that learn each asset's normal behaviour, run on gateways next to the line, and raise prioritised alerts with the contributing signals — handed straight into the existing CMMS as draft work orders a planner approves.
How the project runs
Weeks 1–2
Asset criticality review with maintenance leads; pick 20–40 assets where a stoppage hurts most and sensors already exist.
Weeks 3–5
Gateway deployment, OPC UA and Modbus connections, and a data-quality report per asset: gaps, sampling rates, sensor drift.
Weeks 6–9
Unsupervised anomaly models per asset class, tuned with maintenance engineers reviewing every alert in a shadow period before anyone is paged.
Weeks 10–12
Go-live on one plant: alerts into the CMMS, a weekly alert-quality review, and a runbook for model updates over the air.
Then
Roll out to the remaining plants and add failure-prediction models as confirmed failure events accumulate.
Technology
- Iotron Sentinel
- Industrial gateways
- OPC UA / Modbus
- MQTT
- Time-series store
- Autoencoder & isolation-forest models
- Edge model compression
- CMMS integration
Get in touch
Facing a similar challenge?
Tell us where your version of this problem starts. We will walk you through how we would approach it and what we would measure.